Tag: Aisan

Czech Republic vs Aisan Industry Czech, s.r.o., April 2022, Supreme Administrative Court, Case No 7 Afs 398/2019 - 49

Czech Republic vs Aisan Industry Czech, s.r.o., April 2022, Supreme Administrative Court, Case No 7 Afs 398/2019 – 49

Aisan Industry Czech, s.r.o. is a subsidiary within the Japanese Aisan Industry Group which manufactures various engine components – fuel-pump modules, throttle bodies, carburetors for independent car manufactures such as Renault and Toyota. According to the original transfer pricing documentation the Czech company was classified as a limited risk contract manufacturer within the group, but yet it had suffered operating losses for several years. Following a tax audit an assessment was issued resulting in additional corporate income tax for FY 2011 in the amount of CZK 11 897 090, and on top of that a penalty in the amount of CZK 2 379 418. The assessment resulted from application of arm’s length provisions where the profitability of Aisan Industry Czech, s.r.o. had been determined on the basis of the profitability of comparable companies – TNMM method. An appeal was filed by Aisan Industry Czech, s.r.o. with the Regional Court which – by judgment of 30 October 2019 – dismissed the ... Read more
Czech Republic vs Aisan Industry Czech, s.r.o., October 2019, Regional Court, Case No 15 Af 105/2015

Czech Republic vs Aisan Industry Czech, s.r.o., October 2019, Regional Court, Case No 15 Af 105/2015

Aisan Industry Czech, s.r.o. is a subsidiary within the Japanese Aisan Industry Group which manufactures various engine components – fuel-pump modules, throttle bodies, carburetors for independent car manufactures such as Renault and Toyota. According to the original transfer pricing documentation the Czech company was classified as a limited risk contract manufacturer within the group, but yet it had suffered operating losses for several years. Following a tax audit an assessment was issued resulting in additional corporate income tax for FY 2011 in the amount of CZK 11 897 090, and on top of that a penalty in the amount of CZK 2 379 418. The assessment resulted from application of arm’s length provisions where the profitability of Aisan Industry Czech, s.r.o. had been determined on the basis of the profitability of comparable companies – TNMM method. An appeal was filed by Aisan Industry Czech, s.r.o. with the Regional Court. Judgement of the Regional Court The court dismissed the appeal and ... Read more